Construction and building waste disposal. Sorted.

An integrated system for new builds that cuts disposal cost, makes the site safer and reduces the number of waste collections.

An RSS bulk bag being craned onto a truck beside a house frame under construction

For builders

Skip bins put every trade's waste in one place and most of it in landfill. We supply dedicated bags for each waste stream at every phase of construction, clean the site after each stage, and take everything away for sorting.

The supervisor gets a clean, safe site without chasing trades. The builder gets a known waste cost per build and a report on what was recycled.

  1. 01

    A clean after every stage

    Slab, framing, brick and cladding, lock-up and final clean. Five scheduled cleans, booked against your purchase orders.

  2. 02

    A bag for every trade

    Waste, masonry, Hebel, gyprock and cardboard bags, set up quickly and craned in and out. Almost as if every trade had their own skip.

  3. 03

    Fewer trucks through the estate

    Bags are lifted out by Hiab truck when they are full, not on a fixed skip swap, so there are fewer heavy vehicle movements.

  4. 04

    A known cost per build

    Costs about the same as skip bins, with the cleans included, so waste is a line you can price rather than a surprise.

Aerial view of a slab-stage lot being cleared by a bobcat and tipperSteel house frames going up in a new estateAn RSS masonry bag beside stacked bricks on a building siteA filled RSS bag on the grass verge of a building siteA family walking up to their finished home past the last RSS bags

Five cleans, slab to handover.

Getting started

It starts with a conversation. Send us your site plans and the purchase orders for the job, matching your pricing schedule, so the allowances for waste and brick bags are set before we arrive.

We need at least three days' notice to schedule a job. Urgent jobs are possible; a call-out fee may apply.

Stage 01

Slab

Once external drainage is complete, before the frame is delivered.

  • Initial backblade if needed
  • Waste concrete, reo and mesh removed
  • Front of the site levelled

Bag First general waste bag set up

Stage 02

Framing

When the framers finish, before bricks arrive.

  • Steel and timber offcuts removed
  • Hebel bags for all Hebel removal
  • Site reset for the bricklayers

Bag 1m³ masonry bags placed by the scaffold

Stage 03

Brick and cladding

Once the scaffold comes down.

  • Bobcat, operator and labourer on site
  • Mortar, concrete tile and broken brick bagged
  • Full bags lifted out by Hiab truck

Bag Fresh bag moved closer to the front entry

Stage 04

Lock-up

At lock-up, at the supervisor's request.

  • Gyprock bag in front of the garage
  • Optional cardboard-only bag
  • Internal trades' waste kept separate

Bag Plasterboard and cardboard streams

Stage 05

Final clean

At handover to the landscaper or owner.

  • Emu pick around the whole site
  • Front yard tidied with bobcat and operator
  • Bags on the driveway for the last trades

Bag Site handed over clean

Trusted by the builders putting up NSW's new homes.

Australia's leading project home builders and developers run their sites on the RSS system.

What we do for builders
McDonald Jones Mojo Homes Clarendon Eden Brae Rawson Homes Thrive Homes G.J. Gardner Hotondo Homes
Talk2mebro

Talk to us about your next build.

Tell us the site, the builder and the stage you're at.